BC Vancouver Island Road Conditions Report - Mobile Site

Vancouver Island - Hwy 1, Malahat, Hwy 17, 19, Hwy 4 - Mobile (Mobi) Web Site

Victoria, Naniamo, Port Alberni, Parksville, Campbell River, Tofino, Uluelet, Port Hardy

Events for Vancouver Island

Highway 14 Both directions Construction from Glenshire Drive to the 4-lanes for the new West Shore Parkway Intersection construction 9:00 am to 3:00 pm Mon-Fri until further notice. Expect up to 15 minute delays. Updated on Mon Jun 13 at 3:42 pm PDT. (ID# -58920)
Highway 17 Both directions Maintenance from Mackenzie Avenue, in Saanich to Central Saanich (11.6 km), 9:00 pm to 5:00 am daily starting Jul 4 through Jul 9. Lane closure will be in effect. Updated on Thu Jun 30 at 9:16 am PDT. (ID# -59370)
Highway 17 Both directions Concrete Barrier work between Sayward Road and Haliburton Road 9:00 pm to 6:00 am daily starting Jul 4 through Aug 19. Lane closure will be in effect. Updated on Thu Jun 30 at 4:17 pm PDT. (ID# -59387)
Highway 19A between Parksville and Campbell River Northbound Electrical Maintenance at Qualicum Beach at 2617 Block from 9:00 am to 12:00 pm on Mon Jul 4. The road will be reduced to single lane alternating traffic. Updated on Tue Jun 28 at 10:51 am PDT. (ID# -59312)
Highway 19A between Parksville and Campbell River Northbound Electrical Maintenance at Qualicum Beach starting at 2617 block to 3267 block address from 10:30 am to 2:00 pm on Mon Jul 4. The road will be reduced to single lane alternating traffic. Updated on Tue Jun 28 at 10:31 am PDT. (ID# -59311)
Highway 19A between Parksville and Campbell River Northbound Maintenance at Courtenay 8:00 am to 5:00 pm on Tue Jul 5. Lane closure will be in effect. Updated on Tue Jun 28 at 11:41 am PDT. (ID# -59315)
Highway 28 Both directions Saunders Bridge Maintenance 6 km east of Gold River until further notice. The road is reduced to single lane alternating traffic. Bridge horizontal clearance is restricted to 4.3 metres. Load restriction has been removed. Updated on Tue Oct 13 at 2:46 pm PDT. (ID# -55177)
Highway 28 Both directions Construction from Gold River to Buttle Narrows (40.2 km), 7:00 am to 7:00 pm Mon-Sat starting Jul 4 through Sep 30. The road will be reduced to single lane alternating traffic as required through construction zone. Please obey traffic control personnel and posted speed limits. Updated on Mon Jun 20 at 2:08 pm PDT. (ID# -59135)
Highway 4 Both directions Construction approximately 3 km east of North Boundary of Pacific Rim National Park, in Tofino to Southern Boundary of Pacific Rim National Park near Lost Shoe Creek (18.8 km), through Thu Jun 30 at 6:00 pm. The road is reduced to single lane alternating traffic with up to 20 minutes delay. Traffic control personnel on site. Updated on Wed May 25 at 1:54 pm PDT. (ID# -58520)
Highway 4 Both directions Maintenance between Gertrude St and Margaret St in Port Alberni starting Thu Jul 7 at 9:00 am through Fri Jul 8 at 3:00 pm. Outside lanes will be closed both directions. A separate closure will involve the westbound centre lane just West of Margaret St. Updated on Thu Jun 30 at 9:51 am PDT. (ID# -59371)

Road Reports and Camera images
are provided by the Ministry of
Transportation and Infrastructure (DriveBC)

Note: This 'travel news' services website is privately owned.
It is not affiliated or sanctioned by the Government of BC,
nor is it part of the provincial governments - DriveBC program or websites,
operated by the BC Ministry of Transportation and Infrastructure.