BC Highway 1 - Road Conditions Report - Mobile Site

Events for Highway 1

Highway 1 Highway 1. Bridge maintenance between Spuzzum Creek Rd and Anderson River Mainline (18 km east of Yale). Until Thu Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Alexandre Bridge Rehabilitation is underway with a speed reduction to 50 km/h until October 31, 2019. Last updated Mon Jul 22 at 2:15 PM PDT. (DBC-10291)
Highway 1 Both Directions Highway 1, in both directions. Construction work between Exit 21: Mountain Hwy and Exit 22: Lillooet Rd (North Vancouver - District). Until Thu Jul 16, 2020 at 5:00 AM PDT. Watch for traffic control. HWY 1 Lane Closures Westbound and Eastbound 2300 to 0500 hrs including on and off ramps. SEPT 3 to SEPT 6, SEPT 8 to SEPT 14, SEPT 15 to SEPT 20 and as required NOTE: WB HWY 1 - EXIT 22A CLOSED. Alternate Routes in effect. Last updated Fri Sep 6 at 5:49 PM PDT. (DBC-10429)
Highway 1 Both Directions Highway 1, in both directions. Road maintenance work between 3 km west of east Glacier National Park Boundary and 8 km west of east Glacier National Park Boundary. Until Thu Oct 10. From 7:00 AM to 4:00 PM PDT on weekdays and Saturday. Expect speed reductions to 50 km/h in work zones, flag persons, lane changes, width reductions. Last updated Sat Sep 14 at 6:04 PM PDT. (DBC-10588)
Highway 1 Highway 1. Construction work between Illecillewaet Brake Check and Jumping Creek Rd for 0.2 km (5 km west of West Boundary of Glacier National Park). Until Thu Oct 31. From 7:00 AM to 5:00 PM PDT daily. Expect minor delays. Last updated Fri Sep 6 at 8:34 AM PDT. (DBC-10794)
Highway 1 Both Directions Highway 1, in both directions. Geotechnical investigation between Rogers Pass Summit Rd and Beaver Valley Rd (1 km east of Rogers Pass Summit). Until Thu Oct 10 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Expect speed reductions to 50 km/h in work zone, flag persons for any barrier concrete movements or lane changes. Last updated Mon Aug 12 at 4:27 PM PDT. (DBC-10889)
Highway 1 Eastbound Highway 1, eastbound. Rock scaling between Kicking Horse Rest Area and Park Bridge for 1.7 km (9 to 11 km east of Golden). Until Mon Sep 23 at 8:00 PM MDT. From 7:00 AM to 8:00 PM MDT daily. Right lane closed. Shotcrete placement. Last updated Fri Aug 16 at 4:59 PM MDT. (DBC-11030)
Highway 1 Eastbound Highway 1, eastbound. Construction work between Anderson River Mainline and Thomas Rd (27 km east of Yale). Until Fri Nov 1. From 7:00 AM to 5:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Sat Aug 17 at 6:01 PM PDT. (DBC-11050)
Highway 1 Northbound Highway 1 (on Vancouver Island), northbound. Maintenance between Dobson Rd and Highway 18 for 5.0 km (Duncan). Until Fri Sep 20 at 5:00 AM PDT. From 7:00 PM to 5:00 AM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane closed. Last updated Thu Aug 22 at 12:30 PM PDT. (DBC-11210)
Highway 1 Both Directions Highway 1, in both directions. Construction work between Haliburton Street and 1400 Island Highway in Nanaimo. Until Wed Sep 18 at 3:00 PM PDT. Installation of Telus fibreoptics. Motorists to obey traffic control management and personnel. Last updated Wed Aug 28 at 9:07 AM PDT. (DBC-11360)
Highway 1 Highway 1 (on Vancouver Island). Geotechnical investigation planned between Norcross Rd and Highway 18 for 1.2 km (Duncan to 2 km north of Duncan). Starting Wed Oct 30 at 8:00 PM PDT until Tue Nov 5 at 6:00 AM PDT. Last updated Wed Aug 28 at 3:59 PM PDT. (DBC-11372)
Highway 1 Highway 1. Utility work between Slanzi Rd and Jackass Summit for 22.2 km (Jackass Mountain Summit). Until Fri Sep 27. From 9:00 AM to 5:00 PM PDT on weekdays. Watch for and obey traffic control personnel. Last updated Thu Aug 29 at 10:58 AM PDT. (DBC-11407)
Highway 1 Both Directions Highway 1, in both directions. Paving operations planned between Bernie Rd and Yard Creek Loop Rd for 24.0 km (Sicamous). Starting Mon Sep 16 until Fri Oct 11. From 7:00 PM to 7:00 AM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays of up to 20 minutes. Please watch for and obey traffic personnel and signage. Last updated Fri Sep 13 at 9:47 AM PDT. (DBC-11410)
Highway 1 Highway 1 (on Vancouver Island). Geotechnical investigation planned between Tolmie Lane and Dupplin Rd for 0.1 km (Saanich). Starting Mon Sep 23 at 7:00 PM PDT until Fri Sep 27 at 5:00 AM PDT. Night work only. Last updated Thu Aug 29 at 3:16 PM PDT. (DBC-11413)
Highway 1 Eastbound Highway 1, eastbound. Maintenance between Toll Rd and Skalula Cres for 6.2 km (4 to 10 km east of Yale). Until Fri Sep 27. From 7:00 AM to 5:30 PM PDT daily. Lane Closure. Watch for traffic control. Maintenance in the Saddle Rock Tunnel and Sailor Bar Tunnel. Last updated Wed Sep 4 at 8:20 AM PDT. (DBC-11421)
Highway 1 Eastbound Highway 1, eastbound. Construction work between Exit 170: Highway 3 and Exit 171: Highway 3; Old Hope-Princeton Highway for 0.4 km (Hope). Until Wed Oct 30. From 7:00 AM to 5:00 PM PDT daily. Please obey traffic control. Construction activities will not be taking place during statutory holidays. Last updated Thu Sep 5 at 7:07 AM PDT. (DBC-11479)
Highway 1 Highway 1. Geotechnical investigation between Quartz Creek FSR and Donald FSR for 1.3 km (15 to 17 km east of East Boundary of Glacier National Park). Until Mon Sep 23 at 6:30 PM MDT. From 7:30 AM to 6:30 PM MDT daily. Single lane alternating traffic. Expect minor delays. Last updated Wed Sep 4 at 9:18 AM MDT. (DBC-11516)
Highway 1 Both Directions Highway 1, in both directions. Electrical maintenance planned between MacDonald Showshed and Lanark Snowshed for 1.4 km (2 to 1 km west of West Boundary of Glacier National Park). Starting Mon Sep 16 until Thu Sep 19. From 7:00 AM to 5:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Expect 20 - minute delays. Last updated Fri Sep 13 at 3:38 PM PDT. (DBC-11567)
Highway 1 Both Directions Highway 1, in both directions. Paving operations planned between Griffin Lake Avalanche Gate and Three Valley Frtg for 8.1 km (16 to 24 km west of Revelstoke). Starting Mon Sep 16 at 5:00 AM PDT until Fri Sep 20 at 4:00 PM PDT. From 5:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Last updated Sun Sep 8 at 12:18 PM PDT. (DBC-11580)
Highway 1 Both Directions Highway 1, in both directions. Geotechnical investigation between Jumping Creek Rd and MacDonald Showshed (5 km west of West Boundary of Glacier National Park). Until Fri Oct 18. From 7:00 AM to 5:30 PM PDT daily. Expect minor delays. Last updated Fri Sep 6 at 10:29 AM PDT. (DBC-11601)
Highway 1 Both Directions Highway 1, in both directions. Maintenance between Malakwa Rd and Perry River Bridge for 8.8 km (25 to 17 km east of Sicamous). Until Tue Sep 17 at 3:30 PM PDT. Last updated Mon Sep 9 at 9:27 AM PDT. (DBC-11648)
Highway 1 Both Directions Highway 1, in both directions. There will be ditching between Loop Brook Campground and Beaver Valley Rd. Starting Wed Sep 18 at 7:00 AM PDT until Fri Oct 18 at 5:00 PM PDT. Rock scaling. Speed reductions 50 km/h in work zone. Larger blast requiring extended closure may occur once per week Mon-Thurs 9AM-1PM PST, possible delays of 60 min. Other times 20 min delays. Watch for crews, lane changes, obey traffic control. No stoppages long weekends. Last updated Fri Sep 13 at 4:30 PM PDT. (DBC-11700)
Highway 1 Both Directions Highway 1, in both directions. Paving operations between Highway 5A and Tanager Dr for 10.4 km (Kamloops). Until Fri Sep 27. From 7:00 PM to 6:00 AM PDT on weekdays and Sunday. Last updated Wed Sep 11 at 3:34 PM PDT. (DBC-11745)
Highway 1 Both Directions Highway 1, in both directions. There will be ditching between Tangier River FSR and Illecillewaet Brake Check (8 km east of East Boundary of Mount Revelstoke National Park). Starting Mon Sep 16 at 8:00 AM PDT until Mon Sep 16 at 2:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed Sep 11 at 5:04 PM PDT. (DBC-11747)
Highway 1 Highway 1. Maintenance planned between Golden Donald Upper Rd and Kicking Horse Rest Area for 10.1 km (Golden). Starting Mon Sep 16 at 8:00 AM MDT until Mon Sep 16 at 4:00 PM MDT. Single lane alternating traffic will be in effect. Last updated Thu Sep 12 at 4:42 PM MDT. (DBC-11786)
Highway 1 Highway 1. Maintenance planned between Golden Donald Upper Rd and West Boundary of Yoho National Park for 19.5 km (4 km east of Golden to West Boundary of Yoho National Park). Starting Mon Sep 16 at 8:00 AM MDT until Thu Sep 19 at 4:00 PM MDT. Watch for slow moving vehicle. Last updated Thu Sep 12 at 5:01 PM MDT. (DBC-11787)
Highway 1 Both Directions Highway 1, in both directions. Bridge maintenance planned between Donald Bridge and Donald Cemetery Rd (24 km west of Golden). Starting Thu Sep 19 at 8:00 AM MDT until Thu Sep 19 at 3:00 PM MDT. Lane Closure. Last updated Thu Sep 12 at 9:43 PM MDT. (DBC-11793)
Highway 1 Both Directions Highway 1, in both directions. Bridge maintenance planned between Quartz Creek Bridge (Structure) and Quartz Creek FSR (14 km east of East Boundary of Glacier National Park). Starting Wed Sep 18 at 8:00 AM MDT until Wed Sep 18 at 3:00 PM MDT. Single lane alternating traffic will be in effect. Last updated Thu Sep 12 at 9:48 PM MDT. (DBC-11794)
Highway 1 Both Directions Highway 1, in both directions. Bridge maintenance planned between Quartz Creek Bridge (Structure) and Quartz Creek FSR (14 km east of East Boundary of Glacier National Park). Starting Mon Sep 16 at 8:00 AM MDT until Mon Sep 16 at 3:00 PM MDT. Last updated Thu Sep 12 at 9:51 PM MDT. (DBC-11795)
Highway 1 Both Directions Highway 1, in both directions. Bridge maintenance planned between Donald Bridge and Donald Cemetery Rd (24 km west of Golden). Starting Tue Sep 17 at 8:00 AM MDT until Tue Sep 17 at 3:00 PM MDT. Lane Closure. Last updated Thu Sep 12 at 9:55 PM MDT. (DBC-11796)
Highway 1 Both Directions Highway 1, in both directions. Bridge maintenance planned between Woolsey Creek FSR; East Boundary of Mount Revelstoke National Park and Illecillewaet Brake Check for 4.0 km (5 to 1 km east of East Boundary of Mount Revelstoke National Park). Starting Mon Sep 16 at 5:30 AM PDT until Tue Sep 17 at 2:30 PM PDT. Single lane alternating traffic will be in effect. Last updated Thu Sep 12 at 9:03 PM PDT. (DBC-11797)
Highway 1 Highway 1. Geotechnical investigation planned between Quartz Creek FSR and Donald FSR for 3.8 km (17 to 21 km east of East Boundary of Glacier National Park). Starting Wed Sep 18 at 7:30 AM MDT until Fri Oct 18 at 5:30 PM MDT. From 7:30 AM to 5:30 PM MDT daily. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Fri Sep 13 at 1:07 PM MDT. (DBC-11818)
Highway 1 Highway 1. Special event planned between Ford Rd and James Rd (2 km west of Tappen). Starting Sat Sep 21 at 7:00 AM PDT until Sat Sep 21 at 4:00 PM PDT. Last updated Fri Sep 13 at 2:41 PM PDT. (DBC-11822)
Highway 1 Both Directions Highway 1, in both directions. Construction work planned between 16km W of Glacier Park East Boundary and 3km E of Rogers Pass Summit Rd. Starting Mon Sep 16 until Fri Sep 20. 8AM - 8PM PST daily. Speed reduction to 30 km in work zone, flag persons, lane changes. 2 lanes maintained thru snowshed, both lanes positioned on one side of road. Wide loads accommodated with single lane alternating. Be prepared to stop & obey traffic control. Last updated Fri Sep 13 at 4:04 PM PDT. (DBC-11823)
Highway 1 Both Directions Highway 1, in both directions. Electrical maintenance between Rogers Pass Summit Rd and Beaver Valley Rd for 11.0 km (1 km east of Rogers Pass Summit to 12 km west of East Boundary of Glacier National Park). Until Mon Sep 30. Expect tunnel lights to be off with speed reduced to 30 km/hr from 8:00 PM to 7:00 AM PDT daily with single lane alternating traffic, lane changes and traffic control ending September 30th, 2019. Last updated Fri Sep 13 at 3:51 PM PDT. (DBC-11825)
Highway 1 Eastbound Highway 1, eastbound. Vehicle incident between North Rd and Exit 40: Brunette Ave (Coquitlam). Ramp blocked. Expect delays. Last updated Sun Sep 15 at 2:34 AM PDT. (DBC-11837)
Highway 1 Both Directions Highway 1 (on Vancouver Island), in both directions. Road construction work at Exit 6: McKenzie Ave (Saanich). 900m north to 800m south of McKenzie. Possible delays between 8pm-530 am nightly until further notice. 60 km/hr construction speed zone in effect 24/7. Traffic pattern changes on McKenzie Ave & Admirals Road ongoing until Oct 15 for construction of the Hwy 1 underpass approaches. Last updated Wed Aug 14 at 3:57 PM PDT. (DBC-2630)
Highway 1 Both Directions Highway 1, in both directions. Rock scaling at Yoho National Park 20 km west of Field. Until Fri Oct 25. From 9:00 AM to 1:00 PM MDT on weekdays and Saturday. 24/7 work zone. A larger blast requiring an extended closure may occur with possible delays up to 90 mins. Other times 30 min delays. Reduced speed zones. Be prepared to stop. Watch for truck traffic and obey all signs and traffic control personnel. No stops on long weekends. Last updated Mon Aug 12 at 5:40 AM MDT. (DBC-6641)
Highway 1 Both Directions Highway 1, in both directions. Construction work between 1 Ave SW and 30 St SW for 1.1 km (Salmon Arm). Until Fri Dec 13 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Minor delays due to equipment traffic flow. Last updated Wed May 15 at 12:03 PM PDT. (DBC-7913)
Highway 1 Southbound Highway 1 (on Vancouver Island), southbound. Road construction work between Tillicum Rd and Carey Rd for 1.1 km (Saanich). Until Mon Sep 30. From 7:00 PM to 5:30 AM PDT daily. Southbound lane closure. Lane Shift SB slow/fast lanes between Tillicum Road and Carey Road, median barrier removed. 24hrs a day July through September 2019. Last updated Wed Jul 3 at 3:14 PM PDT. (DBC-9804)

Road Reports and Camera images
are provided by the Ministry of
Transportation and Infrastructure (DriveBC)

Note: This 'travel news' services website is privately owned.
It is not affiliated or sanctioned by the Government of BC,
nor is it part of the provincial governments - DriveBC program or websites,
operated by the BC Ministry of Transportation and Infrastructure.